Controlled delivery, recorded and defensible.
Across 70+ project engagements the work that decides a project is recorded — scope, change, witnesses, results and closeout — so the asset returns to service with a defensible file. Selected controlled references are shown below; deeper records are released only through a confidential route.
Delivery in numbers
Controlled across scope, systems and schedule
Delivered around live operations with 9 OEMs’ equipment, by MVS principals across prior mandates — named references under NDA. Commercial values remain under client confidentiality.
Where the record was built
20 countries. One controlled way of working.
Dry-docks, mobilisations, upgrades and emergency recoveries delivered by the principals and core team — from West Africa and the Gulf to Southeast Asia and the Americas.
delivery countries HQ — Delft, Netherlands Tema operating base, Ghana
Controlled schedule
Every project runs to a baselined, tracked plan
Scope is converted into a baselined schedule with critical path, hold points and tracked progress — the control layer that keeps a fixed dock or mobilisation window. The graphic below is illustrative of the structure, not a client schedule.
Owner-side control layer
What owner-side control actually delivers
- Interface control between owner, yard, Class, OEM and specialists.
- Constraint identification and engineered clearance before float-in.
- Workfront sequencing across a fixed dock or mobilisation window.
- Evidence captured into structured record groups for defensible closeout.
Confidential access
Deeper records are released through a controlled route
Detailed evidence and reference records are made available only after identity, purpose, rights and confidentiality review — never as an unrestricted all-files request.
Running a vendor qualification? Governance, insurance & PQQ evidence follows the same controlled route.