Evidence

Controlled delivery, recorded and defensible.

Across 70+ project engagements the work that decides a project is recorded — scope, change, witnesses, results and closeout — so the asset returns to service with a defensible file. Selected controlled references are shown below; deeper records are released only through a confidential route.

Delivery in numbers

Controlled across scope, systems and schedule

70+
project engagements delivered
40
systems upgraded across 5 vessels, live
30+
azimuth & tunnel thruster units overhauled (UGB & LGB) across the record
40,000+ m²
underwater hull blasted & recoated, controlled

Delivered around live operations with 9 OEMs’ equipment, by MVS principals across prior mandates — named references under NDA. Commercial values remain under client confidentiality.

Where the record was built

20 countries. One controlled way of working.

Dry-docks, mobilisations, upgrades and emergency recoveries delivered by the principals and core team — from West Africa and the Gulf to Southeast Asia and the Americas.

World map marking the 20 countries where the MVS team has delivered, with the Netherlands HQ and the Tema, Ghana operating base highlighted.

delivery countries    HQ — Delft, Netherlands    Tema operating base, Ghana

Controlled schedule

Every project runs to a baselined, tracked plan

Scope is converted into a baselined schedule with critical path, hold points and tracked progress — the control layer that keeps a fixed dock or mobilisation window. The graphic below is illustrative of the structure, not a client schedule.

W0W4W8W12W16W20Feasibility & doabilityScope & workpacksLong-lead & procurementDry-dock executionTrials & commissioningEvidence & closeout

Owner-side control layer

What owner-side control actually delivers

  • Interface control between owner, yard, Class, OEM and specialists.
  • Constraint identification and engineered clearance before float-in.
  • Workfront sequencing across a fixed dock or mobilisation window.
  • Evidence captured into structured record groups for defensible closeout.

Confidential access

Deeper records are released through a controlled route

Detailed evidence and reference records are made available only after identity, purpose, rights and confidentiality review — never as an unrestricted all-files request.

Running a vendor qualification? Governance, insurance & PQQ evidence follows the same controlled route.

Request controlled evidence

Facing a comparable dry-dock, repair or mobilisation?

Tell us the scope and constraints and we will discuss how the same control applies.

Discuss a comparable project